We had the Sassnitz here in Gib on it's way to the breakers.
The trains are loaded fore and aft through bow and stern doors.
Road vehicles are loaded/unloaded via starboard side doors below the bridge from the deck above the train deck and are loaded/unloaded aft via port and starboard ramps that drop down onto the deck.
Message Thread ship plans - ian Struthers January 4, 2023, 14:39:37
« Back to index